About Us
Who we are
Our manufacturers/suppliers possess over three decades of expertise in manufacturing transformers. They have always placed significant priority on the mechanical design and the final finish of the transformers and that they meet the defined dielectric strength, mechanical endurance, dynamic and thermal withstand of winding in the event of short circuits. The calibration and optimization of the transformer designs are done through highly advanced in-house built software.
Omega Transformers.

In our effort to produce highest quality products and services that meet or possibly exceed what is expected by the customer, our suppliers have always made it a priority to sustain a quality control and assurance process of the highest standards. All our products are subjected to strict quality criteria through a comprehensive series of mandatory tests to ensure they adhere to the relevant internationally recognized standards such as IEC, ANSI, and BS prior to being dispatched to the customers.
Our Integrated Management System conforms to ISO 9001, ISO 14001 & OHSAS 18001 and has been certified by DNVGL of the Netherlands. Furthermore, all our transformers are tested and certified by KEMA Netherlands and CPRI India which are among the most renowned test laboratories for transformers.
Our Integrated Management System conforms to
Furthermore, all our transformers are tested and certified by KEMA Netherlands and CPRI India which are among the most renowned test laboratories for transformers.
We understand the importance of having access to the right equipment at the right time.
As keeping customers happy is our main goal. We work hard to deliver unmatched customer service, and we're constantly considering how we may do better and satisfy different needs of our clients.

QUALITY
"QUALITY IS NOT AN ACT, IT IS A HABIT" Quality is the priority in our organization, right from selecting raw material to workmanship to final testing. Supervision and testing is carried out at numerous intermediatory stages for proper quality control.
We test each transformer under- Insulation resistance measurement.
- Measurement of voltage ratio & checking of voltage vector relationship.
- Measurement winding resistance.
- No-load current and no-load loss at rated voltage.
- Measurement of voltage, impedance and load loss.
- Separate surge voltage withstand test.
- Induced voltage withstand test (D.V.D.F)
- Test on oil samples for B.D.V
- Oil leakage test for transformer tank.